November 5, 2026
"A creek is not just a creek, and a garden isn't just a garden," Kerry Wininger, director of Sonoma State's Center for Environmental Inquiry, told SSU News in an Oct. 21 story about this year's work on the Copeland Creek corridor.
Most of us know the Copeland Creek path as a way to get somewhere. It starts near Rohnert Park Expressway and Rancho Verde Circle, follows the greenway east through campus, and ends at Petaluma Hill Road. The 2026 improvements push the other way. The new money went into places to pause along the campus stretch. The city's project to carry the path east to Crane Creek Regional Park is still working out a reroute. So for now, the most interesting part of the trail is the middle.
The campus project grew out of a $50,000 T-Mobile Hometown Grant awarded in 2025. SSU's Department of Kinesiology and the Center for Environmental Inquiry, known on campus as CEI, secured it together. The plan calls for 12 trail posts with color-coded QR codes. Eight were in place when the improvements were unveiled at a celebration on Aug. 29.
Each color leads to a different kind of stop:
The materials are written at about a fifth-grade reading level and come as videos, audio recordings and written pages. A grandparent pushing a stroller and a 10-year-old on a scooter can both use the same post. That is a different audience from the commuters and runners who usually treat this path as a straight line.
The posts also tie the path to the bigger watershed. Copeland Creek runs off Sonoma Mountain, through campus and on toward the Laguna de Santa Rosa and the Russian River watershed. The work is part of CEI's Creeks in Common initiative, which aims to turn the 13-acre campus corridor into an urban watershed demonstration site.
The center of the project is the SSU Native Plant and Butterfly Garden, on the northeast side of campus along the trail. CEI says the gardens are open to everyone. The garden is older than many of the homes nearby. Its roots go back to 1973, and a student project added the butterfly section in the 1990s.
The 2026 refresh made it a place to stay a while. According to SSU News, visitors now find:
"This is a space where everyone can learn, everyone can relax, everyone can exercise, and we want people to spend time here," Nicole Myers, CEI's program and outreach specialist, told SSU News.
One addition is easy to walk past. Electrical engineering students built a solar-powered pedestrian counter and survey station that collects information about how the trail is used and how people feel while using it. Every walk past it adds to that count.
The garden has a standing work crew, and anyone can join. CEI runs drop-in volunteer mornings led by Tessa Thompson, its Native Plant & Butterfly Garden steward. Volunteers pull invasive plants, put in native ones and clean up the corridor. The next session is Friday, Nov. 6.
| Date | Time | Meeting spot |
|---|---|---|
| Friday, Nov. 6 | 11 a.m. to 1 p.m. | Butterfly Garden |
| Friday, Nov. 13 | 11 a.m. to 1 p.m. | Butterfly Garden |
| Friday, Nov. 20 | 11 a.m. to 1 p.m. | Butterfly Garden |
| Friday, Dec. 4 | 11 a.m. to 1 p.m. | Butterfly Garden |
| Friday, Dec. 11 | 11 a.m. to 1 p.m. | Butterfly Garden |
There's no charge and no experience needed. The CEI event page says to just show up on Fridays, but it also says registration is preferred, so check the page before your first visit. Volunteers sign a waiver when they arrive. The sessions are for ages 18 and up, minors need a legal guardian with them the whole time, and pets and smoking aren't allowed. CEI suggests bringing rain, sun and insect protection, sturdy long pants, and shoes that can handle a muddy garden. Bring your own gloves or knee pads if you have a favorite pair.
If you drive, CEI recommends Lot G and asks visitors to buy an SSU daily parking permit online ahead of time. Coming by bike or bus works too. Neighbors west of campus can walk in along the trail itself.
Head east past the garden and you come to the second half of the story. The City of Rohnert Park's project CIP0719 extends the trail from Sonoma State to Crane Creek Regional Park. The plan includes roughly 7,500 feet of trail, bridges, a pedestrian signal at Laurel Drive and Petaluma Hill Road, drainage work, signage and fencing. The route starts where the current trail ends on campus, crosses Petaluma Hill Road at Laurel Drive, and continues east near the city's water-tank access road into the park. Once it reaches Crane Creek, it ties into the park's existing 3.5-mile trail network.
Sonoma State, the city, Sonoma County Regional Parks and Sonoma County Agricultural Preservation & Open Space District broke ground together on May 28, 2025. At the time, SSU News forecast completion by spring 2026. The city's later capital plan moved that target to summer 2026.
The city's most recent public update on the project is an April 28, 2026 staff report to the City Council. It explains the slowdown. Crews found unexpected cultural resources on the site, and work stopped in that sensitive area so the project archaeologist and FIGR could investigate further. City staff then worked with FIGR, the archaeologist, County Regional Parks, contractor Argonaut Constructors and the city's design team on a way forward.
The report describes the solution:
"The trail will be realigned and extended an additional 560 feet to mitigate the installation of the trail near the cultural resources found at project site."
That reroute brings its own costs for remobilization, earthwork, imported soil, geotextile fabric and paving. Argonaut filed a claim on Sept. 18, 2025 for delays tied to the cultural findings, and the city said it would review the cost once Argonaut submits it. Staff asked the council to raise the trail contract's contingency to 37.8% of Argonaut's original contract, or $875,000, up from the original 10%.
The Laurel Drive crossing hit its own surprise. DC Electric Group, which holds the signal contract, ran into a 72-inch storm drain pipe under the intersection that wasn't shown on the plans. The signal layout, pole types and pole count all had to change. County design standards also require part of the intersection to be repaved along with the conduit trenching. Staff asked for the added authority on both contracts to cover the remaining work and any other surprises during the final phase of construction, so the city could move forward and complete the trail and the signal.
The ground east of Petaluma Hill Road held more than the original plans showed, and the extension is being rerouted to respect it. For anyone planning a walk out to Crane Creek, the city's Projects in Progress page is the place to watch for an opening notice.
Until the eastern link opens, the garden works well as a turnaround point for a walk from the west end of the greenway. Four more QR posts are still due on the campus stretch, so stopping by every few weeks may turn up something new.
If you drive to Crane Creek on your own, check the park's rules before you bring a bike. The 2023 Crane Creek Regional Park map marks some routes as multi-use for hikers, equestrians and bikers. All other trails in the park are hiking-only. For current fees, hours and dog rules, go to Sonoma County Regional Parks.
Ashley follows changes like the greenway's new stops and the Crane Creek link because they're part of what living in Rohnert Park looks like day to day. If you live near the Copeland Creek corridor and wonder how these updates fit into your home's value, Ashley McSweeney can walk you through it. Request a free home valuation & consultation.
Stay up to date on the latest real estate trends.
Get assistance in determining current property value, crafting a competitive offer, writing and negotiating a contract, and much more. Contact me today.